Garage cinema continued

All of the framework is now built, and the walls have been plasterboarded as have the ceilings.  Tomorrow the plasterer is coming, and at the weekend we should be able to give it a coat of paint or two!  There's a recess on the left hand wall of the room for a radiator, which will then have some panelling fitted over it so it can't be seen. The panelling at the end of the room hides away the incoming gas and electricity, and the consumer unit. Each side has a large removable panel for access and maintenance.

I'll add some more photos mid week of the plastering, and then another update towards the end of the week with some paint on the walls! I also have some lighting cables I need to fish out and some downlights to fit.

Comments

Post a Comment

Popular posts from this blog

What (the fuck) is HDR?

Finished baffle wall for garage cinema

Photoshopped London Phone Box